Has anybody attempted to calculate equivalent or factored gas turbine starts and/or hours? Something similar to GE's GER3620RevP document on pages 35-36. Looking for tips or best practices as our company uses multiple fuel types and operating profiles. Our corporate-level operating data historian is not always the best, necessitating the use of multiple signals to determine a turbine start or stop.