This use case came up while working with a customer last week, and I thought it was worth sharing on the forum, since other users may be interested.

The user I was working with was interested in creating limits for a signal.  The limits would be calculated based upon the average and standard deviation of the previous 4 hours of operation;  essentially the user wanted to create a rolling 4 hour boundary.  We worked out the following solution:

1. Create a periodic condition for the time period that you would like to use for this rolling window.  Here I created 4 hour periods:

image.png

2. Next, use signal from condition to calculate the average of the signal during each of these 4 hours periods:

image.png

3. Use signal from condition again to calculate the standard deviation of the signal during each of these 4 periods.

image.png

4. Now use Formula to calculate the upper and lower boundaries based on the average and standard deviation.  Here I’m creating boundaries that are +/- 2 standard deviations.  Note that the ‘.delay(4h)’ is needed to shift the boundary signals so that the PV signal is being compared to the upper and lower boundaries calculated in the previous 4 hours.

image.png

5. Once the upper and lower boundaries are identified, use Deviation Search to determine when the signal is outside of these boundaries.

image.png

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

×
×
  • Create New...