Hi,
I work in Australia and seeq is set up to use American date formats, i.e. mm/dd/yyyy rather that dd/mm/yyyy, I was wondering how to change this format on the x axis, as it automatically comes up with that format, is there an option in settings? Similarly, I would like to change the time to 24hr time rather than 12hr time.
Thank you.