We monitor many of our processes live and make adjustments as needed. I have recently been seeing this dashed line. What does this indicate? How do I fix it?
Thanks
Im trying to create capsules using formulas but get errors.
"capsule('August 15 2023 21:00', 'August 17 2023 17:00')"
Do I need to define the asset?
Thanks
Using the composite condition I can look at the intersection of specific phases and recipes. Looking at a 6 month time period I can see total duration based on the total counts of each event. I want to see the duration of each event. How can I see that?
Thanks
Jason
Good day,
I am trying to determine phase run times for each recipe in a particular machine over a 6 or 12 month period. See attached screen shot. This is as far as I could get.
Thanks
Jason
An antigen batch will see multiple pieces of equipment. Is there any way I can quickly compile a list of equipment that a specific batch has been through?