Jump to content

Tyler King

Members
  • Posts

    6
  • Joined

  • Last visited

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

Tyler King's Achievements

Apprentice

Apprentice (3/14)

  • Week One Done
  • Dedicated
  • First Post
  • Conversation Starter

Recent Badges

0

Reputation

  1. So below is a screenshot of my dashboard and the formula behind it. The thought process is to identify a blowdown event when both the "Standby Pressurized Mode" and "Not Operating Depressurized Mode" occur sequentially. So I used a composite condition to join the two and is inclusive of both A & B. It works really well, but when I create a dashboard of the graph that updates to current time, it always places a empty capsule at the end if the unit is in Standby pressurized mode. I just wanted to get rid of that an only show the blowdown event when both conditions are satisfied. This way it doesn't mess up my blowdown count and subsequent data capture of the blowdown event.
  2. When I create an organizer dashboard chart that updates to the current date, it shows some capsules as in-progress at the end of the chart. Is there anyway to turn this off?
  3. Im building a chart which aggregates the duration of operating mode capsules over a monthly period. Currently the month shows up as May1, 2023 12:00am - Jun 1, 2023 12:00am. How do I get this to read just "May 2023" for that month instead of that long string of characters
  4. Thanks for the input! Does seeq have any guidance on how those formulas are built on top of the item in the tree? When I got to Asset Group Editor Mode, I dont see any tools where I could create a formula over a group of signals.
  5. To fill in the gaps between invalid signal values, I use the .validvalues() function, which works very well. But when I swap assets, that function portion of the formula gets deleted. Is there anyway to keep the function portion but just swap the asset signal?
  6. When you duplicate a worksheet is there anyway to break the link between them? Been experience issues when I duplicate a sheet and I make change, the same change is made to the original sheet.
×
×
  • Create New...